ISU LINGKUNGAN PEMBANGUNAN JARINGAN TRANSMISI SUTT 150 KV PLTP KARAHA BODAS KE GI MALANGBONG, KABUPATEN TASIKMALAYA DAN GARUT, PROPINSI JAWA BARAT
Abstrak
The plan construction Transmision line SUTT 150 KV of the PLTP Karaha Bodas at (Sub-District of Kadipaten) to Mainhouse Electricity Malangbong (Sub-District Malangbong) will raise effects to the environment. Identification are the stage of the potential impact before EIA study. Identification is one of the stage to get isues in the field to minimize all the effects that will appear in the future to support sustainable development.
Kata Kunci
Teks Lengkap:
PDFDOI: https://doi.org/10.24198/bsc.v8i2.8248
Refbacks
- Saat ini tidak ada refbacks.
Bulletin of Scientific ContributionPublished by the Faculty of Geological Engineering, Universitas Padjadjaran. e-ISSN: 2541-514X | p-ISSN: 1693-4873 | Policies & LicenseAll articles are published under the terms of the Creative Commons Attribution 4.0 International License (CC BY 4.0). Plagiarism Screening: Every manuscript is strictly checked using Turnitin/iThenticate databases. | Editorial OfficeFaculty of Geological Engineering | ||||
Indexed & Abstracted By | ||||||
| © 2026 Universitas Padjadjaran. All rights reserved. | Bulletin of Scientific Contribution. | ||||||